Information for Projects in Progress

  1. 2023 ANNUAL CONCRETE
  2. 2023 ANNUAL CATCH BASIN
  3. 2023 ANNUAL STREET STRIPING
  4. 2023 ANNUAL PREVENTATIVE MAINTENANCE
  5. 2023 ANNUAL ASPHALT REPAIR
  6. 2023 TRAFFIC SIGNAL MAINTENANCE PROGRAM
  7. FOREST GLEN TREE REPLACEMENT
  8. MILES RD RETAINING WALL
  9. 2022 SEWER GROUTING
  10. 2021 SEWER GROUTING
  11. 2020 SEWER GROUTING
  12. SOLON ROAD RECONSTRUCTION

2023 Annual Concrete Repair Program

Contractor: Konstruction King


Scope:

Construction of concrete pavements or sections of, including roadways, sidewalks; curbs; drive aprons and handicap ramps. All schedule timing is weather dependent.

Contract Amount:

$2,409,475.00

Start Date:

A preconstruction meeting has been scheduled.

Substantial Completion Date:

October 13, 2023

Road Repair Locations:

LocationScheduled
Start
Scheduled
Complete
SIDE 1
SIDE 2



StartFinishStartFinish







Buckboard Lane





Buckboard Cul-de-sac






Edgemoor Avenue - Inwood Road to Linden Drive





Parkside Trail Cul-de-sac





Davis Industrial Repairs





Fire Station 1 Driveway





Other miscellaneous locations will include:
Farm Drive